-40%
DAE DDM730P, RS485, 120/240V kWh Meter, 100A,1P3W,Internal CT,60 Hz,Pass Through
$ 47.51
- Description
- Size Guide
Description
DAE DDM730P, With RS485 communication, 120/240V kWh Meter, 100 Amp, Internal CT, hot wire pass through, 1 Phase 3 wire (2 hot wire and 1 neutral), 60Hz or 50HzDAE Cloud Metering (2nd picture) available with DAE CC2030 Gateway. CC2030 will collect energy data from DAE electrical meters and send them to Cloud Server through Ethernet. With PC, cell phone or tablet, landlords or property managers can get access to real time data, monthly kWh and billing reports to their tenants. TOU (Time of Use) billing reports are also available. No IT guy required. Just connect wires as per a simple picture (see video) & ready to go.
Wireless remote reading available with DAE WSC500 (www.ebay.com/itm/163080739313) RF converters. Factory Calibration Certificates available. DAE Controls LLC is an Minority Business. Please feel free to get the NMSDC Minority Supplier Certificate from DAE Controls Website.
Indoor use only, DAE B1725 watertight NEMA 4 enclosure (www.ebay.com/itm/162593174985) is available for outdoor use.
If you are interested in cloud metering or wireless water management or looking for a large quantity, please contact us.
Most of our customers will be able to receive their items in 3 business days (Continental US). If you order by 4pm Eastern Time Monday through Friday we shall deliver in the same day.
Conforms to International Standard IEC62053-21 and IEC62052-11
Pulse output: 800 pulses per kWh
For installation, please proceed with the following steps.
Switch off the power
Dis-connect the hot wires (L1, L2) from the two pole breaker. (Usually the 240V comes from two hot wires)
Insert the hot wire L1 through the L1 hole of DDM730P. Insert the hot wire L2 through the L2/N hole of DDM730P.
Connect the hot wires (L1, L2) back to the two pole breaker.
Drive down 2 small tap screws, penetrating the hot wire insulation, picking up the voltage reference and powering the meter.
If the hot wire diameter which passes through the meter is under 0.2 inch, please insert the wire into the tubes (attached with the meter) first and then passes through the meter.
If the hot wire diameter is more than 0.2 inch, please pass the wire through the meter directly without using the tubes.
The hole diameter on DAE DDM730P is 0.45 inch. If your wire size is more than AWG 4 (0.37 inch dia, including insulation), please choose DAE P153-200-S KIT (www.ebay.com/itm/162864010654).
The dimension of DDM730P is 3.46 in (88 mm) long, 2.95 in (75 mm) wide and 2.87 in (73 mm) height.
1% accuracy, No conversion factor or multiplier needed.
LCD Display, 99999.9 kWh.
DIN-rail mount, 1.33mm standard DIN rail installation, complying with standard DIN EN5002.
With“TX/RX LED” indication and “Impulse LED” indication.
Non-volatile Memory, the stored data is maintained through power outages.
CTs are built inside of the DEM730P electric meter. It is not necessary to purchase external CTs.